BCL - Best Casa Line

Installation

Installations are mostly laid on the upper side of the ceiling. In the desired position, the wiring is passed through from the upper side to the underside. Installation can take place during or after erecting the ceiling elements. Openings, installation shafts, and borings can also be carried out later at any time.

An additional grooving along the longitudinal edge of the element makes it possible to lay the wiring directly in the ceiling.